2025 · Regular session · House bill

HB2898

HB2898 requires advance notice to the Texas Department of Transportation before erecting a covered wind-measurement tower, and requires the department to share that notice with specified radar facilities, military aviation traini…

Read bill highlights ↓

Official caption: Relating to requirements for certain meteorological evaluation towers.

Signed by governorSource-checked explanation published

Official report lists House author(s): Frank. This does not identify sponsors or amendment drafters.

Report an error ↗

Bill explanation published · Version and amendment review scope is stated below · Individual amendment records may not be separately annotated.

Bill highlights

Selected points from the published explanation. Follow each point to its source-linked context; conditions and limits may matter.

Read the full explanation ↓

What does it do?

HB2898 requires advance notice to the Texas Department of Transportation before erecting a covered wind-measurement tower, and requires the department to share that notice with specified radar facilities, military aviation training facilities and county judges. It also expands the covered tower definition from a base diameter of no more than six feet to no more than 12 feet. The structure must be self-standing or supported by guy wires and anchors, with equipment used to assess a site’s wind resources for a wind turbine generator. Final law.

The person erecting the tower must submit the department’s online form at least 30 days before erection begins. Required information includes the owner’s or operator’s contact details, the site’s latitude, longitude and ground elevation, tower height, proposed starting date and other information the department needs to identify ownership, physical characteristics or location. The owner or operator must report changes to that information.

Within 30 days after receiving the notice, the department must send copies to federally owned or operated radar installations and military aviation training facilities in Texas whose boundaries are within 50 nautical miles of the tower; the judges of Texas counties containing those facilities; and the judges of Texas counties within 25 miles of those facilities. A military aviation training facility is a base, station, fort or camp where any U.S. armed-forces branch regularly conducts aviation training. The two distance rules use different units and measure different relationships.

Existing exclusions remain: structures adjacent to a building, including a barn, or an electric utility substation, and structures in the area immediately associated with a residence, are excluded. Existing painting and marking duties for covered towers 50–200 feet above ground remain; that height range is not expressly repeated as a limit on the new advance-notice duty. Owner/operator registration rules also remain. Violating the section remains a Class C misdemeanor, rising to Class B if the violation results in a collision causing injury or death. Transportation Code Section 21.071.

The law took effect September 1, 2025, after being signed June 20. It specifies notice before new erection, not a new retrospective 30-day notice deadline for towers already standing. It does not replace other applicable aviation requirements. Official history.

What changed along the way?

The filed bill and House committee printing already contained the larger base-diameter limit, online advance notice, updates and notice-sharing requirements. They referred broadly to military installations and would have notified judges of counties adjacent to a county containing a qualifying installation.

The sole indexed floor amendment, offered by Frank and adopted May 1, replaced that military-installation language with the defined aviation-training category and replaced the adjacent-county rule with the 25-mile facility-distance rule. Those changes appear in the House-passed version and survive in the final law. The Senate printing and enrolled text have the same substantive provisions. Text-version index; amendment index.

For the full amendment record, open the official amendment index.

Official bill versions

Compare the published text versions in the official text index. A change is not attributed to a specific amendment here without a verified record.

Who could benefit—and who could bear the costs?

Radar operators, military aviation trainers and affected county officials receive earlier information about new towers. Tower developers must plan around the advance-notice deadline, and owners/operators must keep information current. Expanding the definition can bring wider-base towers within these rules. Notice is not a guarantee that a tower is safe or permission to disregard other requirements.

The May 16 fiscal note anticipates no significant fiscal impact to the state or local governments, assuming implementation costs can be absorbed with existing resources. It does not quantify private compliance costs or promise that every tower owner will incur no expense. The bill makes no separate appropriation.