2025 Texas sessionsRegular and both called sessions have ended. This index covers House and Senate bills, not resolutions. Statuses come from official reports.

← Back to bills

2025 · Regular session · House bill

HB3092

HB3092 raises from three miles to five miles the maximum length of a qualifying transmission line connecting an electric utility's existing transmission facilities to a load-serving substation or metering point without amending i…

Read bill highlights ↓

Official caption: Relating to a certificate of public convenience and necessity to construct an electric transmission line.

Signed by governorSource-checked explanation published

Official report lists House author(s): Gerdes, Curry, Darby. This does not identify sponsors or amendment drafters.

Report an error ↗

Bill explanation published · Version and amendment review scope is stated below · Individual amendment records may not be separately annotated.

Bill highlights

Selected points from the published explanation. Follow each point to its source-linked context; conditions and limits may matter.

Read the full explanation ↓

What does it do?

HB3092 raises from three miles to five miles the maximum length of a qualifying transmission line connecting an electric utility’s existing transmission facilities to a load-serving substation or metering point without amending its certificate of public convenience and necessity. That certificate is a state utility authorization; this is an exception to amending it, not a general exemption from every construction or safety requirement. Final law.

The law retains two important conditions: every landowner whose property is directly affected, as determined under Public Utility Commission rules, must give written consent, and all rights-of-way needed for construction must have been purchased. A right-of-way supplies the property rights needed to place the line. Merely being five miles or shorter is not enough.

The separate limit for lines connecting to a generation substation or metering point remains two miles. The five-mile change concerns connections serving electricity demand, not every connection serving a power generator.

The governor signed June 20, 2025; the law took effect September 1, 2025. Official history.

Implementation context: The PUC’s 2026 implementing order confirms that the statutory exemption was already effective and does not expand eminent-domain authority. The current certification rule reflects five miles and retains reporting and commission oversight. “Directly affected” is not necessarily limited to land physically crossed by the line: the notice rule also addresses nearby habitable structures and specified substation neighbors. A separate rule provision for lines no longer than one mile has a narrower consent condition; HB3092’s new five-mile limit should not be confused with that provision.

What changed along the way?

The filed bill, House committee printing, House-passed version, Senate printing and final law make the same substantive change: three becomes five, while the generation-line limit and landowner/property-right conditions stay. The amendment index lists no amendments. All versions.

For the full amendment record, open the official amendment index.

Official bill versions

Compare the published text versions in the official text index. A change is not attributed to a specific amendment here without a verified record.

Who could benefit—and who could bear the costs?

Utilities and customers needing qualifying short connections may avoid the time and administrative expense of a certificate-amendment proceeding for lines longer than three miles but no longer than five. Affected landowners retain the written-consent condition for this exemption. The bill does not guarantee a particular construction timetable, lower electricity rates or a forced sale of property.

The May 22 fiscal note anticipates no significant state or local-government fiscal impact, assuming state costs can be absorbed using existing resources. It does not quantify private project savings or effects on electricity bills. The act makes no appropriation.

Official sources

Catalog report retrieved 2026-10-25. Check the official record for corrections or later changes.